Bridgeport 115kV Railroad Upgrades (Baird to Congress)
About the project:
The Project will replace transmission structures on two line sections from Baird Substation in Stratford to Congress Substation in Bridgeport. A majority of the new structures will be located within the Connecticut Department of Transportation’s (“CDOT”) existing right-of-way. The remaining structures will require the acquisition of permanent easements.
The Project is in two sections:
- from Baird Substation in Stratford to Congress Substation in Bridgeport where the overhead transmission North Section line extends for approximately 2.3 miles east to west and
- from Baird Substation in Stratford to Congress Substation in Bridgeport, where the overhead transmission South Section line extends east to west for approximately 2.3 miles.