English Station is the site of a closed power generating plant in New Haven that was originally built in the late 1800's.
The "Site" is located at 510 Grand Avenue in the City of New Haven, Conn. and consists of approximately 8.9 acres of made-land on the southern end of an island (Ball Island) located within the Mill River. The entire Site is enclosed by steel bulkhead, except for the portion of the Site along Grand Avenue.
The portion of the Site identified as "Parcel A" (the northern portion) is approximately 3.58 acres in size. Parcel A is occupied by a portion of a former electrical generating plant commonly referred to as "Station B". Station B consists of the northern portion of a former power plant constructed circa 1890 and is a two-story structure that occupies a footprint of approximately 25,000 square feet. Station B is immediately adjacent to Grand Avenue, which runs along the Site's northern property boundary. Station B was a coal fired generating facility that ceased operation in 1903.
The boiler portion of Station B was demolished in the late 1930's. The remainder of the property, identified as "Parcel B", encompasses the southern portion of the Site and is approximately 5.32 acres in size. Parcel B occupied by the English Station power generating plant, which has an approximate footprint of 100,000 square feet. Parcel B was created in the 1920's by expanding the bulkhead structure to the southern and filling the interior to construct English Station.
The first generating units at English Station began operation in 1929 and the plant and island footprint underwent several expansions up to 1952. The plant ultimately housed 14 boiler units that were coal fired until the late 1950's, when they were converted to oil firing. The plant ceased operation in 1992.
Public Notifications:
- Project Status
- Public Meetings
- Public Meeting Regarding the Remediation of the English Station Site (PDF)
- Presentation: English Station Remediation Update (PDF)
- March 11, 2019 Community Update Meeting (PDF)
- Presentation: English Station Remediation Community Update 031119 (PDF)
- March 11, 2019 Community Update Q&A (PDF)
- November 19, 2019 Community Update Meeting (PDF)
- Presentation: English Station Remediation Community Update 111919 (PDF)
- November 19, 2019 Community Update Q&A (PDF)
- Abutter Notifications
- June 5, 2017 Letter (PDF)
- March 4, 2019 Mailing (PDF)
- November 5, 2019 Mailing (PDF)
Frequently Asked Questions:
Orders, Studies and Reports:
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part1
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part2
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part3
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part4
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part5
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part6
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part7
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part8
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part9
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part10
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part11
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part12
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part13
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part14
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part15
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part16
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part17
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part18
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part19
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part20
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part21
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part22
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part23
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part24
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part25
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part26
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part27
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part28
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part29
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part30
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part31
- Station B Abatement & Demolition Closure Report 06-11-2020 SUBMITTED COMPLETE_Part32
- English Station Parcel A PCB Clean-Up 40 CFR 761.61(a) and (c).EPA Approval 12.17.2019
- English Station Revised Parcel A PCB RAP (PDFs)
- English Station Parcel A PCB RAP Submitted 12-6-2019_Part1
- English Station Parcel A PCB RAP Submitted 12-6-2019_Part2
- English Station Parcel A PCB RAP Submitted 12-6-2019_Part3
- Appendix A - North Side Investigation Report_Part1
- Appendix A - North Side Investigation Report_Part2
- Appendix A - North Side Investigation Report_Part3
- Appendix A - North Side Investigation Report_Part4
- Appendix A - North Side Investigation Report_Part5
- Appendix A - North Side Investigation Report_Part6
- Appendix A - North Side Investigation Report_Part7
- Appendix A - North Side Investigation Report_Part8
- Appendix A - North Side Investigation Report_Part9
- Appendix A - North Side Investigation Report_Part10
- Appendix A - North Side Investigation Report_Part11
- Appendix A - North Side Investigation Report_Part12
- Appendix A - North Side Investigation Report_Part13
- Appendix A - North Side Investigation Report_Part14
- Appendix A - North Side Investigation Report_Part15
- Appendix A - North Side Investigation Report_Part16
- Appendix A - North Side Investigation Report_Part17
- Appendix A - North Side Investigation Report_Part18
- Appendix A - North Side Investigation Report_Part19
- Appendix B - South Side Investigation Report_Part1
- Appendix B - South Side Investigation Report_Part2
- Appendix B - South Side Investigation Report_Part3
- Appendix B - South Side Investigation Report_Part4
- Appendix B - South Side Investigation Report_Part5
- Appendix B - South Side Investigation Report_Part6
- Appendix B - South Side Investigation Report_Part7
- Appendix B - South Side Investigation Report_Part8
- Appendix B - South Side Investigation Report_Part9
- Appendix B - South Side Investigation Report_Part10
- Appendix B - South Side Investigation Report_Part11
- Appendix B - South Side Investigation Report_Part12
- Appendix B - South Side Investigation Report_Part13
- Appendix B - South Side Investigation Report_Part14
- Appendix B - South Side Investigation Report_Part15
- Appendix B - South Side Investigation Report_Part16
- Appendix B - South Side Investigation Report_Part17
- Appendix B - South Side Investigation Report_Part18
- Appendix B - South Side Investigation Report_Part19
- Appendix C - Written Certification
- Appendix D - Permit Application Signature Pages
- Appendix E - Located in PCB RAP Report Documents Above
- Appendix F - Public Notice Documentation
- Appendix G - Debris Pile Photographs_Part1
- Appendix G - Debris Pile Photographs_Part2
- Appendix H - Geoprobe Procedures
- Partial Consent Order Number COWSPCB15-001 (PDF):
- Bulkhead Inspection Report
- TRC Scope of Study (PDFs)
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments (split into 7 parts):
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 1
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 2
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 3
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 4
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 5
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 6
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments Part 7
- 092018 Scope of Study (Partial)-English Station Interior Boiler 1-12 Area
- 092018 ES SOS Boilers 1 - 12 Figures
- 092018 ES SOS Boilers 1 -12 Tables
- 111418 Scope of Study-Eng Station Boiler 1-12 Boiler 13 14 portions-bldg matls (Partial) vers w attachments (split into 7 parts):
- Remedial Action Reports (PDFs):
- North and South side Investigation Reports (PDFs)
- North Side Investigation Report 1-29-18 Part 1
- North Side Investigation Report 1-29-18 Part 2
- North Side Investigation Report 1-29-18 Part 3
- North Side Investigation Report 1-29-18 Part 4
- North Side Investigation Report 1-29-18 Part 5
- North Side Investigation Report 1-29-18 Part 6
- North Side Investigation Report 1-29-18 Part 7
- South Side Investigation Report 2-28-18 Part 1
- South Side Investigation Report 2-28-18 Part 2
- South Side Investigation Report 2-28-18 Part 3
- South Side Investigation Report 2-28-18 Part 4
- South Side Investigation Report 2-28-18 Part 5
- South Side Investigation Report 2-28-18 Part 6
- South Side Investigation Report 2-28-18 Part 7
Additional Information Contacts:
- Samantha Marone, Public Outreach Manager
203.499.3824 or samantha.marone@uinet.com - Amy Hicks, Public Outreach Specialist
203.499.2586 or amy.hicks@uinet.com